Musikhaus Keks
Welcome!
Our cookies offer you a fast, relaxed and full-featured shopping experience. Some are necessary to operate the website and its functions. Others help us to improve our services. If you agree to this, simply consent to the use of cookies for preferences, statistics and marketing by clicking on "OK". Alternatively, you can deactivate individual cookies under "Customise cookies" or all cookies, except those required for the function of our website, under "Reject all".
Musikhaus Korn Guide

Planning Stage Platforms: Guide for Stages & Events

A modular stage does not begin with a single deck. Start with the required width, depth, height and intended use. Only then should you choose deck sizes, plug-in legs, connectors, stairs, handrails, levelling components and transport solutions. Planning these parts as one system allows a small number of standard modules to become drum risers, DJ platforms, presentation stages, concert stages and temporary event areas.

Calculate area & deck grid Plan height & access together Consider outdoor use & transport
Global Truss GT Stage Deck 200 by 50 centimetre Outdoor modular stage platform
Deck + legs + connectors + access = a complete modular stage system
0.5–1 m² Area covered by current standard deck formats
20–140 cm Height ranges covered by current leg options
Modular Combine decks, legs, stairs and connectors
Outdoor Use only suitable decks and complete structures
From application to platform system

Which Stage Platform Setup Do You Need?

Start with the function of the platform. A 20 cm drum riser has very different requirements from a significantly elevated concert stage. A permanent indoor platform also differs from a system that is loaded into a vehicle and rebuilt every week.

Band & Drums

Small Stage Riser

A low platform raises drums, keyboards or solo performers visibly without requiring a complete concert stage. Short fixed legs keep setup simple and compact.

DJ & Presentation

Raised Working Area

A DJ booth, speaker or product presentation can already be separated clearly from the audience using a relatively small modular platform. Plan cable routes and access at the same time.

Concert & Event

Modular Main Stage

Larger stages are assembled from matching decks. Variable legs, stairs, handrails and system connectors make the platform adaptable to changing productions.

Open Air

Outdoor Stage Area

Outdoor applications require suitable deck surfaces, a load-bearing substrate, correct levelling and careful assessment of the stability of the complete structure.

Recommended planning order: stage width × stage depth → deck format → platform height → access → connection and levelling → fall protection → transport.

A deck alone is not yet a stage

How Is a Modular Stage Platform Built?

A system deck consists of a load-bearing walking surface, a frame and suitable leg sockets. Several decks are levelled and connected together. Depending on height and intended use, plug-in legs, additional connectors, stairs, handrails and other protective components are added.

Walking Surface

Deck

The actual stage surface. Different standard sizes allow rectangular stages, long rows and smaller additions.

Height

Plug-In Legs

Legs determine the platform height. Fixed legs are quick and simple, while telescopic or variable legs provide greater flexibility.

Connection

Clamps & Levellers

Platform clamps, leg clamps and deck levellers help adjacent modules form one coordinated surface.

Access

Stairs & Handrails

Modular stair elements and matching handrails create an access route appropriate to the actual platform height.

Build the stage on paper first

Calculate Stage Area and Number of Decks

The basic formula is simple: width × depth = required stage area. The current GT Stage Deck range at Musikhaus Korn includes 200 × 50 cm, 100 × 100 cm and 100 × 50 cm Outdoor modules.

Comparison of current Global Truss GT Stage Deck formats
Deck Format Area Planning Strength Typical Use
200 × 50 cm 1.0 m² Long rectangular grid Stage rows and catwalk-style layouts
100 × 100 cm 1.0 m² Simple square-metre planning Regular rectangular grids
100 × 50 cm 0.5 m² Fine adjustment Edges, small risers and gap filling

Example – 4 × 3 metre stage: 4 × 3 m equals 12 m². If you use only 1 m² decks, you need twelve deck surfaces mathematically. Before ordering, also draw the orientation of each deck, stair position, cable routes and any non-rectangular areas.

Greater visibility changes access and safety

Which Stage Height Is Appropriate?

The higher the platform becomes, the more important access, lateral protection, stabilisation and setup logistics become. Platform height should therefore never be selected independently from the rest of the stage.

20 cm

Low Riser

Useful for drums, instruments, presentation areas or simple visual separation. Short fixed legs keep the structure compact.

40 cm

Clearly Raised

Provides a more visible elevation while keeping the overall setup comparatively manageable. Plan the access route together with the height.

40–100 cm

Variable Stage Height

Variable legs are useful when the same system is regularly used at different heights or for changing productions.

80–140 cm

High Platform Structures

Higher constructions require particularly careful professional planning of loads, bracing, access and fall protection.

Fixed or Variable Legs?

Fixed legs are lightweight and quick to install when the same stage height is used repeatedly. Variable legs make different heights possible and can be more flexible for changing productions.

Can Telescopic Legs Compensate for Uneven Ground?

Height adjustment helps with levelling, but does not replace an adequately load-bearing and suitable substrate. Outdoor stability must be assessed for the complete structure and actual ground conditions.

The important question is not: “How high can the stage become?” Ask instead: “Which height is genuinely necessary for visibility, suitable access and safe operation?”

People and equipment must be considered together

Do Not Estimate Loads by Feel

Musicians, drums, digital pianos, backline and technical equipment produce different loads. A uniformly distributed load is not the same as a concentrated point load from heavy equipment.

Product-Specific Value

750 kg/m² on Selected GT Decks

The current Musikhaus Korn product pages for the GT Stage Deck Outdoor 200 × 50 cm and 100 × 100 cm state a maximum load of 750 kg/m².

Point Loads

Distribution Matters

Heavy equipment concentrated on a small area must not be assessed in the same way as a load distributed evenly across the deck surface.

Complete Structure

Deck + Legs + Connections + Ground

The permissible structure is always determined by the complete configuration. A deck rating is not automatically the rating of the entire assembled stage.

Do not transfer load figures: always use the current manufacturer documentation and applicable technical requirements for the exact deck, legs, connectors and construction being built.

Access is part of the stage

Plan Stairs, Handrails and Fall Protection Early

A raised stage requires access appropriate to its actual height and use. The current GT Stage Deck range includes modular stair elements for 20, 40 and 60 cm configurations and a handrail designed for corresponding stair combinations.

Stairs

Match the Steps to the Height

The required stair combination depends on the actual platform height. Transitions should be uniform, clearly recognisable and free from cables.

Handrail

Integrate Access Components Early

A stair handrail is easier to incorporate during initial planning than after the complete platform perimeter and access route are already fixed.

Stage Edges

Assess Fall Hazards Separately

Professional stages require a project-specific risk assessment and compliance with current requirements. Do not assume that a stair handrail automatically serves as stage-edge fall protection.

Current DGUV guidance: a fall hazard is considered to exist at heights above 1 metre. Even below 1 metre, the risk assessment may require protective measures, for example when an edge is difficult to recognise or footing is unsafe.

Turn individual modules into one surface

Why Do You Need Levellers and Platform Clamps?

Alignment

Deck Leveller

A deck leveller aligns neighbouring deck edges at a common height and helps create a more even transition between modules.

Deck Connection

Platform Clamp

The GT Stage Deck platform clamp connects two neighbouring deck elements. According to the current product information, Global Truss recommends one clamp per connected metre.

Leg Connection

Two- and Four-Way Leg Clamps

Leg clamps connect neighbouring platform legs and can add additional stability within the intended system configuration.

Do not estimate the parts list: draw every deck joint and every leg position first, then determine connector quantities according to the system and assembly instructions.

Outdoors, the complete structure matters

Plan Outdoor Stage Platforms Correctly

An Outdoor-rated deck is only one component. For outdoor events, the ground, stability of the complete structure and all expected environmental and operating conditions must be considered.

Ground

Check the Substrate

Soft, sloping or uneven ground requires a technically appropriate solution. Do not improvise with unsuitable packing materials.

Deck

Choose an Outdoor-Suitable Surface

The deck surface and construction must be explicitly suitable for the intended environment.

Roof & Truss

Treat Other Structures Separately

A roof, ground support or larger truss structure is its own structural system and is not simply an accessory attached to the platform.

Touring begins in the warehouse

Include Transport and Storage from the Beginning

A 12 m² stage does not consist only of twelve square metres of deck surface. Legs, stairs, clamps, levellers and handrails need their own storage and vehicle space as well.

Deck Handling

Transport Decks Together

A suitable trolley reduces individual handling and keeps compatible decks organised in storage. Always check the exact deck dimensions supported by the trolley.

Small Parts

Sort Connectors Clearly

Levellers, clamps and other connecting hardware should be stored in clearly labelled containers so quantities can be checked quickly.

Loading Order

Think About Setup Sequence

Components required first should not be buried beneath all the stage decks when the vehicle is unloaded.

The current modular system

18 Components for Modular Stage Platforms

The current Musikhaus Korn Stage Platforms category includes deck surfaces, fixed and variable legs, modular stairs, a stair handrail, platform and leg clamps, levelling hardware and transport equipment.

Compatibility is more important than brand mixing

Manufacturers for Stage Platforms & Stage Construction

Decks, legs, connecting hardware and stair components should be explicitly intended for the planned combination. A visually matching component is not automatically structurally compatible.

Buying is not the best solution for every event

Need a Large Stage Only Occasionally?

For a single city festival, open-air event or corporate production, renting a complete mobile stage can be more practical than purchasing a large number of decks, stairs, railings and roof components.

Musikhaus Korn's rental range includes mobile stages in several sizes as well as additional PA, lighting and event equipment.

Example of a professional mobile rental stage for larger temporary outdoor events
For individual large events, a complete rental stage may simplify logistics significantly
Avoid planning errors before ordering

What Is Often Forgotten When Planning Stage Platforms?

Mistake 1

Ordering Only Square Metres

A complete stage also needs legs, connectors, suitable access and, depending on the structure, additional protective components.

Mistake 2

Planning the Stairs Afterwards

Access requires additional space beside the stage and therefore already influences the original floor plan.

Mistake 3

Reusing a Load Figure Universally

Always assess the exact deck and complete permitted setup configuration.

Mistake 4

Ignoring the Ground

A strong deck cannot compensate for unsuitable or insufficiently load-bearing ground.

Mistake 5

Placing Decks Loosely Side by Side

Use the intended system connectors and levelling components for a common modular structure.

Mistake 6

Underestimating Transport Volume

Stairs, legs, clamps and other components require additional warehouse and vehicle space beyond the decks themselves.

Common planning questions

Stage Platforms Explained Simply

How many stage decks do I need for a 4 × 3 metre stage?

A 4 × 3 metre stage has an area of 12 m². If you use only decks covering 1 m² each, you need twelve deck surfaces mathematically. Legs, connectors, stairs and any required protective components are added afterwards.

Which stage-deck size is the most flexible?

A 100 × 100 cm deck is particularly easy to plan in a square-metre grid. A 200 × 50 cm deck efficiently creates long rows, while a 100 × 50 cm deck is useful for smaller areas and fine adjustment.

Which height is suitable for a drum riser?

A drum riser does not need to be particularly high to create a separate visual level. Low fixed legs can therefore be useful. Determine the final dimensions from the actual drum kit, performer requirements and stage layout.

Do I need variable stage legs?

If the stage always uses the same height, fixed legs are straightforward. Variable legs are useful when several stage heights or changing production situations are planned.

How are two stage decks connected?

The GT Stage Deck system uses components such as platform clamps, deck levellers and, depending on the setup, leg clamps. Quantities and positions should be determined from the current system instructions.

Does a stage platform always need stairs?

That depends on height and intended use. Whenever safe direct access is not available, an appropriate access solution must be planned. Higher and publicly used structures require consideration of all current project-specific requirements.

When does a stage need a railing or fall protection?

This cannot be determined from the deck product alone. Fall height, intended use, public access and the project-specific risk assessment interact. Professional productions must additionally comply with the current requirements applying to event venues and workplaces.

Can stage platforms be used outdoors?

Yes, provided both the deck and the complete structure are suitable for the intended conditions. Current GT Stage Deck products in this selection are offered as Outdoor versions, but substrate and overall stability still require separate assessment.

How much weight can a stage platform carry?

This is product-specific. The current GT Stage Deck Outdoor 200 × 50 cm and 100 × 100 cm product pages state 750 kg/m². This value must not be transferred automatically to other decks or arbitrary complete structures.

Should I buy or rent stage platforms?

For regularly repeated small and medium-sized setups, owning a modular platform system can make sense. For a single large open-air project, a complete rental stage may be easier economically and logistically.

Treat the stage as a complete event system

Related Equipment Around Your Stage

Structure

4 Point Truss Systems

Plan truss for lighting and stage construction as a separate load-bearing system.

Visibility

Stage Lighting

Select front light, PARs and moving heads to suit the stage dimensions and performer positions.

Sound

PA & Sound Reinforcement

Position speakers, subwoofers and monitoring together with the stage layout.

Safety Equipment

Safeties & Security

Add suitable professional safety and event-technology accessories where required.

Planning summarised

A Good Modular Stage Is Planned as One Complete System

Calculate width and depth first and turn them into a practical deck grid. Then select fixed or variable legs for the required height. Plan platform clamps and levellers together with the deck layout and treat stairs, handrails and fall protection as part of the original concept, not late accessories. Outdoor structures additionally require assessment of the ground and expected environmental conditions. For mobile stages, transport and storage belong in the original parts list as well.

Plan more event technology correctly

Open the Musikhaus Korn Guide

Stage construction, lighting, PA systems, mixers, microphones, DJ technology, recording and musical instruments: the central Musikhaus Korn guide leads to further buying advice, comparisons and complete setup solutions.